COMPARISON KM-2 Thermal Desorption Unit and TW300 SWU
COST ITEM KM-2 TW300 Production Potential TPH 5-18 30-45 Cost of Unit $1.1M used $550K, NEW Operational Costs Fuel Consumption 80 gal/hr LP or minimum of 4 gal LP/Ton processed 12-15 GPH diesel for 250KW diesel gen set Power Generation 8 gph diesel, 57.5 KW required for operation (70 KW diesel gen set) Up to 250KW, with system heaters for surfactant tanks Maintenance Required 2 hrs out of 24 No min., less than 1 hr per 24 hours Filtration System Filter replacement as required None Bag House For dust abatement None Soil Type Limitation Yes, in advisable to process -200 soils, pumice due to dust abatement issues None Soil Moisture Content Cannot process soils containing more than 15% moisture None, can process any soil no matter the moisture content Control System Electronic, very expensive to replace or repair Electro-mechanical (switch gear) Chemical Requirement None Surfactant in water, dilution rate from 1:1 to 1:10, cost varies with surfactant cost Recovery of Contaminate? No, combustion process Yes, hydrocarbons and other contaminates can be reclaimed Contaminate Limitations? Yes, ineffective on heavy metals, PCBs No limitations
Copyright ©1997-2008 by Lawrence D. Wood, ALL RIGHTS RESERVED.
The foregoing is presented for informational and technology comparison purposes, only. No other use is intended or authorized.
Back to Wood Family Main Page, or Terra Resources, Ltd.